Modular floating pumping station PNS-5-7500 to be installed on the Ural River near Atyrau

KB "Stapel" has completed the development and transfer of the technical design for the modular floating pumping station (PNS-5-7500) to the Kazakhstan company TOO "Bekbolatovtar Kurulys Kompaniyasy". The Kazakhstan Shipping Register oversees the construction of the facility, which is being carried out by the customer. This was announced by the bureau's press service.

PNS-5-7500 is a non-self-propelled object consisting of five modules with superstructure-pavilions. The total capacity of the five main Grundfos electric pumps is 12,500 m³/h.

The station is expected to be installed on the Ural River near Atyrau. The facility will help solve the water supply problem in western Kazakhstan. PNS-5-7500 will operate 24/7 in automated mode.

To protect against winter accidents caused by ice and slush formation, buoyancy pontoons with guardrails are installed on three sides of the hull. To prevent icing, five ice-hole generators (2000 m³/h each) and electric convectors for heating are provided. To prevent fish from entering, ROP-500 devices are installed on each suction pipeline.

The operation of the mechanisms does not require constant staff presence and is controlled remotely from a shore post via an Ethernet interface. On-duty personnel will be able to periodically inspect the facility.

Сейчас на главной

eGov GPT chatbot received AI & Digital Bridge Awards 2026

eGov GPT chatbot received AI & Digital Bridge Awards 2026

AI-powered digital assistant helps to obtain over 50 public services

Astana to Host International GSMA M360 Eurasia Forum

Astana to Host International GSMA M360 Eurasia Forum

The event is scheduled for autumn 2027

AI assistant of call center 1414 handled about 27 thousand calls

AI assistant of call center 1414 handled about 27 thousand calls

The digital assistant processed almost 40% of questions independently

Dual-purpose poles and base stations to be installed: Internet access checked in East Kazakhstan region

Dual-purpose poles and base stations to be installed: Internet access checked in East Kazakhstan region

The Ministry of Industry and Digital Development of Kazakhstan controls the implementation of the national project

Up to 30% useful fractions: the first stage of the waste processing plant launched in Pavlodar

Up to 30% useful fractions: the first stage of the waste processing plant launched in Pavlodar

The sorting center's capacity is 150 thousand tons of solid waste per year

100% Localization: The first batch of 13-6922 model flat wagons delivered to KTZ-Express

100% Localization: The first batch of 13-6922 model flat wagons delivered to KTZ-Express

The rolling stock was assembled at the RWS Wagon plant in Petropavlovsk

Over 120 Thousand Passenger Cars and Trucks Assembled in Kazakhstan in 2026

Over 120 Thousand Passenger Cars and Trucks Assembled in Kazakhstan in 2026

Astana Motors Manufacturing Kazakhstan and Kia Qazaqstan Implemented Industrial Robots