Over 750 turnouts laid on railway tracks in Kazakhstan since beginning of 2026
Relief trains are equipped with KZh-1572, EDK-300/2 cranes and T-330 bulldozers
Translated with AI from the Russian original.
Employees of the relief train services installed over 750 turnouts on railway tracks from January to September 2026. A total of 38 specialized units operate across Kazakhstan’s mainline network, according to the KTZ press service.

Tactical drills were held at a station in Astana, practicing response procedures in the event of a railcar derailment. According to regulations, upon receiving a call, a relief train must depart for the incident site within 40 minutes.
The capital’s relief train serves 4 routes with a total length of 565 km:
- Astana – Akkol (105 km)
- Astana – Yereymentau (140 km)
- Astana – Anar (90 km)
- Astana – Atbasar (230 km)
The rolling stock is equipped with KZh-1572 railway cranes (lifting capacity of 150 tons) and an EDK-300/2 self-propelled diesel-electric crane (lifting capacity of 60 tons), as well as T-330 and T-3501 bulldozers. It includes a power generator car, crew cars, a dining car, rigging and cable equipment cars, and a garage car.
In 2026, the KTZ Relief Train Service marks its 90th anniversary. On November 11, 1936, the People’s Commissariat of Railways of the USSR designated the service as an independent department.











